Water Supply & Sewerage Systems
We deliver end-to-end civil solutions for water supply schemes, sewerage systems, and municipal infrastructure development. Our expertise includes RCC drains, pipelines, elevated storage reservoirs, and complete turnkey water management projects.
Our team consists of professionally qualified and experienced Project Managers, Estimators, Quantity Surveyors and Site Managers – enabling us to provide an end-to-end service from design through pre-construction, to delivery and aftercare. Supported by a carefully selected, pre-qualified.
our services include
working process
We have a track record of delivering significant extension and expansion projects for buildings as diverse as schools, leisure centres, churches, and industrial units – providing much needed space and new facilities for our clients. We are used to working in close proximity to occupied buildings.
Execution & Civil Works
Construction of drains, reservoirs, pipelines with quality and durability.
Service List
Water Supply & Sewerage Systems Projects
🚧 Urban Water Supply Network Expansion – City Zone III
This project involved the development and expansion of a 24×7 urban drinking water distribution network covering residential, commercial, and industrial zones across the city.
Key Scope of Work
- Laying of 110 km DI & HDPE pipelines (100mm–600mm dia)
- Construction of 2 Elevated Service Reservoirs (ESR – 1.5 ML each)
- Installation of high-capacity pumping units with automation
- House service connections for more than 18,500 households
- Leak detection, pressure testing & network calibration
Project Outcome
The upgraded water supply system ensured continuous 24×7 water availability, reduced water loss, and improved service delivery across the municipality.
🚧 Sewerage Network Development & STP Construction – Municipal Zone A
A comprehensive project to strengthen the city’s sewerage system by integrating a new sewer network with a modern Sewage Treatment Plant (STP).
Key Scope of Work
- Laying of 65 km RCC & HDPE sewer pipelines
- Construction of main pumping station (MPS) & 3 intermediate lifting stations
- Development of a 20 MLD Sewage Treatment Plant (MBBR Technology)
- Manholes, chamber construction & household sewer connections
- Treated water reuse system for gardening & industrial supply
- Final asphalt overlay and drainage system development
Project Outcome
The project improved sanitation, reduced groundwater contamination, and ensured safe, environmentally compliant wastewater management.
EXPLORE MORE PROJECTS



